廣告位
自定內容

當前日期時間
自定內容

 

產品搜索
 
分析不銹鋼浮雕骨架的制作程序
作者:管理員    發布于:2015-08-22 10:09:51    文字:【】【】【
摘要:根據浮雕模型按比例核算到所需高度,浮雕內骨架的選用的剛才和管材的型號直徑是不同的,不銹鋼浮雕的主體的框架是由粗變細、由密而疏焊成方籠。

    根據浮雕模型按比例核算到所需高度,浮雕內骨架的選用的剛才和管材的型號直徑是不同的,不銹鋼浮雕的主體的框架是由粗變細、由密而疏焊成方籠。
    According to the scale of the relief model to calculate the required height, the selection of the internal skeleton of the selection of the model is different from the pipe diameter is different, the main body of the main body of the stainless steel relief, from the dense and sparse welded into a square cage.


    各個管材、鋼材之間的使用焊接連接的,焊接前,除檢查切口平整度外,對管壁厚度大于或等于4㎜的管子,應對管端加工V型坡口,管子坡口應按規定留有坡口間隙。所有承重骨架采用雙面滿焊,整體骨架完成后用防銹漆滿涂三遍。
    Between each pipe, steel welding connection, before welding, in addition to check the smooth incision givers and the tube wall thickness is greater than or equal to 4 mm tube, deal with pipe end machining V-shaped groove, groove of the pipe should be required to leave a gap groove. All load bearing frame with double side welding, the whole skeleton is finished with anti rust paint over three times.


    不銹鋼浮雕在副支架結構設計時,常取單塊銅壁板作分離體,壁板上鑄有支耳,使其與副支架的一端相連,桿的另一端則連接到主支架上。
    Stainless steel relief in the sub frame structure design, often take a single piece of copper plate for the separation, the board has a supporting ear, so that it is connected with the side bracket, the other end is connected to the main bracket.


    為了達到副支架能將銅壁板上的載荷傳遞到主支架上,對銅壁板上支耳的數目、位置、副支架與主支架連接所形成的空間夾角等應以它們能組成一個超靜定結構為準。
    In order to achieve the load transfer to the main bracket on the copper plate, the number, position, the position of the supporting ear, the position of the bracket and the space angle formed by the connection between the main support and the other side of the copper plate, the space angle formed by the connection between the copper plate and the main bracket.


    為提高結構的安全性,對統計出的實際重量、風速還得加一個放大系樓再用于主、副支架的設計。主支架的外廓形狀和尺寸的設計,用1:5中樣模型來測取,從底平面開始,取垂直Z軸的橫截面與浮雕外廓交線的一線點,量取其平面坐標值。取點數的多少,應以能準確繪制出此截面上一整圈外廓形狀的曲線為準。
    In order to improve the safety of the structure, the actual weight, wind speed and wind speed have to be used in the design of the main and auxiliary support. Contour shape and size of the main bracket design, with 1:5 model to test, from the bottom level began to, take vertical Z axis of the cross section and relief contour intersection point line, a measurement the plane coordinate values. How many points should be taken, can accurately draw the cross section of a circle contour curve is.


    不銹鋼浮雕的主支架承受的主要載荷,穩態風載。在選定風速下,一般考慮正面、側面、背面、等四個方面作用在雕像身上的各方向風力。
    Main load, steady wind load of the main frame of stainless steel. Under the selected wind speed, generally considered the front, the side, the back, and so on four aspects function on the statue body each direction wind.

 

關注公眾平臺

聯系我們
 公司地址:中國。鄭州

 咨詢電話:15978409299

 微  信:15978409299

 咨詢 QQ:2764182758

 官方網站:

 http://www.jinlancao.com

 微信平臺:jinlancaobihua

 博  客:

 http://blog.sina.com.cn/jinlancao

 公司地址:中國。鄭州市區

 高新區企業公園E座502室

 工廠地址:鄭州中國。鄭州市 科學大道與淮陽路交匯北500米路東。

(來廠提前預約)

腳注信息
版權所有:河南金蘭園林景觀工程有限公司;   咨詢預約熱線:0371--56759299,手機(微信):15978409299,官方網址:http://www.uywaqng.com


 Copyright(C)2009-2015  豫ICP備17008189號-4

? 无码av中文字幕久久专区